Success Stories: 30% Production Increase with MFS
Success StoriesApr 28, 20263 min

Success Stories: 30% Production Increase with MFS

We analyze how a plant in Chile managed to optimize its processes after implementing our consulting.

The Challenge

One of the largest forming plants in the central region of Chile faced a critical problem: its main line suffered constant stoppages due to welding problems and premature tool wear. The plant's OEE had dropped to 62%.

Before MFS

  • Frequent stops for adjustment
  • 15% material waste
  • Short lifespan of consumables

After MFS

  • OEE increased to 85%
  • Waste reduced to 3%
  • Optimized energy consumption

The Implemented Solution

Our technical team conducted a complete audit of the line. A new AGR filtering system for the lubricant was implemented, the tooling package was redesigned, and the impeders were updated to a return flow system.

The result was immediate: a cleaner weld, lower temperature in the critical zone, and a sustained increase in line speed of 30%, exceeding the client's initial expectations.